Lansdowne Rd Culvert Replacement

Client: Mackay Regional Council

Lansdowne Rd Culvert Replacement

 

Pentacon was principal contractor & work scope was to replace the stormwater culvert structure at Lansdowne Road.

 
  • Site management including environmental management and significant erosion and sediment control, quality management, community liaison, traffic management in accordance with MUTCD Part 3 and contract specific requirements

  • Earthworks and excavation for culverts, pipes and conduit trenches

  • Removal or demolition of culverts and concrete base slabs

  • Installation of culverts, concrete base slabs and end structures to culverts

  • Road re-construction including pavements, seal

  • Linemarking

  • Regulatory signage

  • Removal and reinstatement of concrete sleeper fish baffles

  • Reinstatement of roadside furniture

  • Landscaping works