Sarina Northern Drainage - Stage 2
Client: Mackay Regional Council
Sarina Northern Drainage - Stage 2
Pentacon is the principal contractor for the construction of an open trunk drain, reinforced concrete invert, reinforced concrete machinery crossings with stormwater drainage.
The existing drains were in poor condition and experienced flooding by residents.
Site Establishment/Disestablishment was undertaken.
Survey set out
Location and protection of existing services
Provision for planning, design, implementation, administration and removal of Traffic
Management Systems (TMS)
Safety, environmental and quality management
Quality control and compliance testing of the works
Condition survey of adjoining properties and surrounding areas
Clearing and grubbing works
Earthworks and Backfilling - Bulk earthworks approx. 42,000m3 including refilling of Detention Basin
Erosion and sediment control devices including silt fences
Supply and install of concrete culverts and concrete culvert end structures
Culverts include removal and relocation of existing RCBC's
Supply and install of stormwater chambers
Construct reinforced concrete drain invert and concrete machinery crossings
Rock protection
Type J subgrade treatment along each side of the concrete drain lining and bridging layer under the concrete lined drainage to replace unsuitable soil
Hydromulching, Hydroseeding and turfing including landscaping and horticultural maintenance period
Restoration of all disturbed areas