DTMR | Tchanning Creek Timber Bridge Replacement

Client: Department of Transport and Main Roads

DTMR | Tchanning Creek Timber Bridge Replacement

 

Pentacon was the principal contractor for the replacement of Tchanning Creek Bridge, including demolition.

 

The project consisted of the below:

Roadworks Work Package

  • Drainage, retaining structures and protective treatments;

  • Installation of culverts;

  • Clearing and grubbing;

  • Insitu stabilised pavements;

  • Sprayed bituminous treatments;

  • Road furniture;

  • Landscape and revegetation works;

  • Linemarking.

Bridgeworks Work Package

  • Erosion and sediment control;

  • Drainage, retaining structures and protective treatments;

  • General earthworks;

  • Driven steel piles;

  • Erection of prestressed concrete deck and kerb units;

  • Bridge deck;

  • Bridge barrier installation;

  • Deck wearing surface;