DTMR | Tchanning Creek Timber Bridge Replacement
Client: Department of Transport and Main Roads
DTMR | Tchanning Creek Timber Bridge Replacement
Pentacon was the principal contractor for the replacement of Tchanning Creek Bridge, including demolition.
The project consisted of the below:
Roadworks Work Package
Drainage, retaining structures and protective treatments;
Installation of culverts;
Clearing and grubbing;
Insitu stabilised pavements;
Sprayed bituminous treatments;
Road furniture;
Landscape and revegetation works;
Linemarking.
Bridgeworks Work Package
Erosion and sediment control;
Drainage, retaining structures and protective treatments;
General earthworks;
Driven steel piles;
Erection of prestressed concrete deck and kerb units;
Bridge deck;
Bridge barrier installation;
Deck wearing surface;