Flood Protection Levee Works
Client: Pembroke Olive Downs Pty Ltd
Flood Protection Levee Works
Pentacon is the principal contractor & scope of work is to construct a flood protection levee at Pembroke Olive Downs Complex.
Site management, environmental and erosion management, safety and qualitymanagement
Clearing, grubbing and stockpiling of vegetation
Stripping of topsoil and stockpiling
Excavation of unsuitable material from core trench
Ground surface treatment under embankment, in keyway
Win/import, haul, place and compact levee embankment
Win, haul, place and trim stripped topsoil from stockpile over levee embankment
Grass seeding to levee embankment
Rock protection including placement of geotextile
Gravel wearing course supply and lay
Volumes:
Total bulk earthworks: 391,030m3
Total topsoil & final trim: 20,000m3
Total pavement capping: 6,500m3