Mary St Road Widening
Client: Sunshine Coast Regional Council
Mary St Road Widening
Pentacon was principal contractor & work scope was to upgrade Mary St, Landsborough from the existing 4m wide bitumen seal road to an 8m wide bitumen seal road, with the length of works approximately 370m.
Site management including pedestrian management, traffic management, community liaison, environmental management (including fauna and pest management), erosion and sediment control management, safety and quality management
Drainage removal/demolition (including pipes, culverts, catchpits, endwalls, manholes, reinforced footings)
Supply and install of pipe culvert components, culvert end structures
Concrete kerb and channel and kerb crossings (driveway ramps)
Subsoil drains
Protective treatments
Earthworks
Unbound pavements
Two coat seal sprayed bituminous surfacing
Linemarking
Removal and re-erection of road furniture including mail boxes and fencing, guide posts, guardrail
Relocation of/alterations to existing services
Landscaping works