Settlers Rise Stage 4 Bulk Earthworks
Client: Paragon Consulting Engineers Pty Ltd
Settlers Rise Stage 4 Bulk Earthworks
Pentacon was the principal contractor & work scope was to undertake bulk earthworks for Settlers Rise Estate - Stage 4.
Site management including environmental management and significant erosion and sediment control, quality management, community liaison.
Clearing and grubbing
Strip and stockpile topsoil
Earthworks cut to fill
Excavate and removal of unsuitable material
Removal of non-rippable rock by hammering
Turfing of open drains
Grass seeding, fertilising and watering disturbed areas
Supply and install new stock fence
Undertake flow tests on existing site bore
Install new water bore & conduct testing
Supply and install lockable galvanised steel gate
Supply and install rock check dams
Construct flow diversion berms
Locate and protect underground services
Works to Telstra pits and conduit